WWTP

The wastewater treatment plant of the city of Osijek is an integral part of its infrastructure that has a huge impact on the local ecosystem. Osijek lies on the fairly large river Drava and is near swamp nature reserve of Kopački Rit and the Drava-Danube estuary. Its designed capacity of 170,000EC is well above the current needs and inline of future population trends.

A large international team was assembled for this project. The project is divided in to three phases: Embankment and groundwork, facility for mechanical purification and the facility for biological purification. Our team was brought later in the project as experts and we were tasked with reevaluation of all previously made documentation and taking over the execution design.

Category: Under Construction
Year: 2022
Area: 165000
Total investment: 27.5M€